Google Integrator V2 - Online Help
Google Integrator V2
Questions / Feedback?

WorksheetDateUpdated Property

Contains the date that a worksheet was updated.

Syntax

 gspreadsheets.getWorksheetDateUpdated([callback])
 gspreadsheets.setWorksheetDateUpdated( worksheetDateUpdated, [callback])

Default Value

""


Callback

The 'callback' parameter specifies a function which will be called when the operation completes (or an error is encountered). If the 'callback' parameter is not specified, then the method will block and will not return until the operation completes (or an error is encountered).

The callback for the getWorksheetDateUpdated([callback]) method is defined as:

function(err, data){ }

'err' is the error that occurred. If there was no error, then 'err' is 'null'.

'data' is the value returned by the method.

The callback for the setWorksheetDateUpdated([callback]) method is defined as:

function(err){ }

'err' is the error that occurred. If there was no error, then 'err' is 'null'.

'err' has 2 properties which hold detailed information:

err.code
err.message

Remarks

This property is used to get the updated date of a worksheet and is populated when WorksheetIndex is set.

The format of the date will depend on the DateFormat you are currently using. Unless otherwise specified, the default format used is "yyyy-MM-ddTHH:mm:ss.fffZ" (e.g. 2011-04-04T18:44:20.000Z).

This property is not available at design time.

Data Type

String

 
 
Copyright (c) 2017 /n software inc. - All rights reserved.
Build 2.0.6240.0