IPWorks Encrypt 2020 ActiveX Edition

Questions / Feedback?

Progress Event

Fired as progress is made.

Syntax

Sub salsa20control_Progress(BytesProcessed As Long64, PercentProcessed As Integer)

Remarks

This event is fired automatically as data is processed by the control.

The PercentProcessed parameter indicates the current status of the operation.

The BytesProcessed parameter holds the total number of bytes processed so far.

Copyright (c) 2022 /n software inc. - All rights reserved.
IPWorks Encrypt 2020 ActiveX Edition - Version 20.0 [Build 8155]